Supplier · Peer benchmark
Peer comparison
How Chippindale Plant Limited stacks up against suppliers competing for the same workloads — based on overlap with its 20 signature CPV codes over the last 24 months. Target HQ: South East.
Value band:
/
CohortChippindale Plant Limited(You)Kier ConstructionDennis Eagle LimitedESH CONSTRUCTION LIMITEDNorthgate Vehicle Hire Limited247 TRANSPORT SOLUTIONS LTD
iAuto-picked from 20 signature CPV codes · last 24 months overlap
Metric | KC Kier Construction Peer · rank #1 | DE Dennis Eagle Limited Peer · rank #2 | EC ESH CONSTRUCTION LIMITED Peer · rank #3 | NV Northgate Vehicle Hire Limited Peer · rank #4 | CP Chippindale Plant Limited (You) · target supplier | 2T 247 TRANSPORT SOLUTIONS LTD Peer · rank #6 |
|---|---|---|---|---|---|---|
01ActivityVolume, scale, freshness | ||||||
| 12-month contractedAward value, last 12m | £4.3bn | £71.2m | £54.5m | £9.2m | £46k(−100%) | — |
| Framework headroomPer-supplier share of framework ceilings | — | — | — | — | — | £3.7m |
| Total awarded (lifetime)All time, all contracts | £12.6bn | £877.4m | £1.5bn | £1.1bn | £22.6m(−98%) | £5.3m |
| Contracts won (12m)Distinct awards last year | 37 | 47 | 29 | 3 | 1(−97%) | |
How to read a target cell
The target column carries a delta — value compared to the peer median for that row. Direction-of-good varies by metric, so deltas are neutral.
Peer cell£499m(peer median £255m)
→
Target cell£11.7m(−97% vs median)
Money:
£N.Nm, £Nk, £N.NbnPercent: 42% · pp delta: (+12pp)Day delta: (−149 days) · missing: —