Supplier · Peer benchmark
Peer comparison
How BALFOUR BEATTY CIVIL ENGINEERING (SW) LIMITED stacks up against suppliers competing for the same workloads — based on overlap with its 2 signature CPV codes over the last 24 months. Target HQ: London.
Value band:
/
CohortBALFOUR BEATTY CIVIL ENGINEERING (SW) LIMITED(You)Willmott Dixon Construction LimitedIan WilliamsTopcoat Construction Limited / TCL GroupWestone HousingM GROUP HIGHWAYS LIMITED
iAuto-picked from 2 signature CPV codes · last 24 months overlap
Metric | WD Willmott Dixon Construction Limited Peer · rank #1 | IW Ian Williams Peer · rank #2 | TC Topcoat Construction Limited / TCL Group Peer · rank #3 | WH Westone Housing Peer · rank #4 | BB BALFOUR BEATTY CIVIL ENGINEERING (SW) LIMITED (You) · target supplier | MG M GROUP HIGHWAYS LIMITED Peer · rank #6 |
|---|---|---|---|---|---|---|
01ActivityVolume, scale, freshness | ||||||
| 12-month contractedAward value, last 12m | £4.1bn | £237.2m | £67.6m | £67.6m | £61.3m(−9%) | £2.4m |
| Framework headroomPer-supplier share of framework ceilings | £26.5m | — | — | — | — | £123.3m |
| Total awarded (lifetime)All time, all contracts | £11.8bn | £1.1bn | £153.8m | £81.2m | £61.9m(−60%) | £125.7m |
| Contracts won (12m)Distinct awards last year | 34 | 26 | 5 | 6 | 1(−88%) | |
How to read a target cell
The target column carries a delta — value compared to the peer median for that row. Direction-of-good varies by metric, so deltas are neutral.
Peer cell£499m(peer median £255m)
→
Target cell£11.7m(−97% vs median)
Money:
£N.Nm, £Nk, £N.NbnPercent: 42% · pp delta: (+12pp)Day delta: (−149 days) · missing: —