Supplier · Peer benchmark
Peer comparison
How UK Docks Marine Services North Limited stacks up against suppliers competing for the same workloads — based on overlap with its 6 signature CPV codes over the last 24 months. Target HQ: North East.
Value band:
/
CohortUK Docks Marine Services North Limited(You)Salterns Marina LtdDevonport Royal Dockyard LimitedSIEMENS MOBILITY LIMITEDSiemens Mobility Costain JVHitachi Rail GTS UK Limited and Telent Technology Services Limit
iAuto-picked from 6 signature CPV codes · last 24 months overlap
Metric | UD UK Docks Marine Services North Limited (You) · target supplier | SM Salterns Marina Ltd Peer · rank #2 | DR Devonport Royal Dockyard Limited Peer · rank #3 | SM SIEMENS MOBILITY LIMITED Peer · rank #4 | SM Siemens Mobility Costain JV Peer · rank #5 | HR |
|---|---|---|---|---|---|---|
01ActivityVolume, scale, freshness | ||||||
| 12-month contractedAward value, last 12m | £85.4m(+53%) | £56.5m | £55.0m | — | — | — |
| Framework headroomPer-supplier share of framework ceilings | — | — | — | — | — | — |
| Total awarded (lifetime)All time, all contracts | £86.8m(−74%) | £59.1m | £4.4bn | £2.1bn | £328.2m | £80.5m |
| Contracts won (12m)Distinct awards last year | 3(0%) | 1 | 3 | 3 | — | |
How to read a target cell
The target column carries a delta — value compared to the peer median for that row. Direction-of-good varies by metric, so deltas are neutral.
Peer cell£499m(peer median £255m)
→
Target cell£11.7m(−97% vs median)
Money:
£N.Nm, £Nk, £N.NbnPercent: 42% · pp delta: (+12pp)Day delta: (−149 days) · missing: —