Supplier · Peer benchmark
Peer comparison
How MEMS POWER GENERATION LIMITED stacks up against suppliers competing for the same workloads — based on overlap with its 2 signature CPV codes over the last 24 months.
Value band:
/
CohortMEMS POWER GENERATION LIMITED(You)Wates Construction LimitedP & I GENERATORS LIMITEDPlayfords LimitedK2 International, LLC.Bells Power Specialist
iAuto-picked from 2 signature CPV codes · last 24 months overlap
Metric | WC Wates Construction Limited Peer · rank #1 | P& P & I GENERATORS LIMITED Peer · rank #2 | MP MEMS POWER GENERATION LIMITED (You) · target supplier | PL Playfords Limited Peer · rank #4 | KI K2 International, LLC. Peer · rank #5 | BP Bells Power Specialist Peer · rank #6 |
|---|---|---|---|---|---|---|
01ActivityVolume, scale, freshness | ||||||
| 12-month contractedAward value, last 12m | £251.9m | £1.0m | — | — | — | — |
| Framework headroomPer-supplier share of framework ceilings | £32.8m | — | — | — | — | — |
| Total awarded (lifetime)All time, all contracts | £7.1bn | £1.7m | £162k(−90%) | £24.8m | £949k | £143k |
| Contracts won (12m)Distinct awards last year | 20 | 3 | 1(−67%) | 1 | — | |
How to read a target cell
The target column carries a delta — value compared to the peer median for that row. Direction-of-good varies by metric, so deltas are neutral.
Peer cell£499m(peer median £255m)
→
Target cell£11.7m(−97% vs median)
Money:
£N.Nm, £Nk, £N.NbnPercent: 42% · pp delta: (+12pp)Day delta: (−149 days) · missing: —