Supplier · Peer benchmark
Peer comparison
How North West Projects Ltd T/a Actemium Design UK stacks up against suppliers competing for the same workloads — based on overlap with its 1 signature CPV code over the last 24 months. Target HQ: North West.
Value band:
/
CohortNorth West Projects Ltd T/a Actemium Design UK(You)MEARS LIMITEDAsbestech LtdASPECT CONTRACTS LIMITEDAlternative Heat LtdSureserve Fire & Electrical
iAuto-picked from 1 signature CPV code · last 24 months overlap
Metric | ME MEARS LIMITED Peer · rank #1 | AS Asbestech Ltd Peer · rank #2 | AC ASPECT CONTRACTS LIMITED Peer · rank #3 | NW North West Projects Ltd T/a Actemium Design UK (You) · target supplier | AH Alternative Heat Ltd Peer · rank #5 | SF Sureserve Fire & Electrical Peer · rank #6 |
|---|---|---|---|---|---|---|
01ActivityVolume, scale, freshness | ||||||
| 12-month contractedAward value, last 12m | £504.5m | £2.3m | £4k | — | — | — |
| Framework headroomPer-supplier share of framework ceilings | — | £32k | £32k | — | £4.0m | — |
| Total awarded (lifetime)All time, all contracts | £4.2bn | £157.9m | £120.0m | £0.17(−100%) | £168.7m | £24.0m |
| Contracts won (12m)Distinct awards last year | 6 | 4 | 6 | 2(−60%) | 2 | |
How to read a target cell
The target column carries a delta — value compared to the peer median for that row. Direction-of-good varies by metric, so deltas are neutral.
Peer cell£499m(peer median £255m)
→
Target cell£11.7m(−97% vs median)
Money:
£N.Nm, £Nk, £N.NbnPercent: 42% · pp delta: (+12pp)Day delta: (−149 days) · missing: —