Supplier · Peer benchmark
Peer comparison
How HLM DESIGN INTERNATIONAL LIMITED stacks up against suppliers competing for the same workloads — based on overlap with its 8 signature CPV codes over the last 24 months. Target HQ: North West.
Value band:
/
CohortHLM DESIGN INTERNATIONAL LIMITED(You)AECOM LIMITEDGalliford Try Construction LimitedMace Consult LimitedQinetiQ LimitedRingway Infrastructure Services Limited
iAuto-picked from 8 signature CPV codes · last 24 months overlap
Metric | AE AECOM LIMITED Peer · rank #1 | GT Galliford Try Construction Limited Peer · rank #2 | MC Mace Consult Limited Peer · rank #3 | QI QinetiQ Limited Peer · rank #4 | HD HLM DESIGN INTERNATIONAL LIMITED (You) · target supplier | RI Ringway Infrastructure Services Limited Peer · rank #6 |
|---|---|---|---|---|---|---|
01ActivityVolume, scale, freshness | ||||||
| 12-month contractedAward value, last 12m | £224.7m | £189.7m | £70.7m | £38.4m | — | — |
| Framework headroomPer-supplier share of framework ceilings | £4.8m | — | £2.6m | — | — | £2.0bn |
| Total awarded (lifetime)All time, all contracts | £828.0m | £1.9bn | £738.3m | £3.2bn | — | £4.8bn |
| Contracts won (12m)Distinct awards last year | 136 | 11 | 15 | 7 | — | 1 |
How to read a target cell
The target column carries a delta — value compared to the peer median for that row. Direction-of-good varies by metric, so deltas are neutral.
Peer cell£499m(peer median £255m)
→
Target cell£11.7m(−97% vs median)
Money:
£N.Nm, £Nk, £N.NbnPercent: 42% · pp delta: (+12pp)Day delta: (−149 days) · missing: —