Supplier · Peer benchmark
Peer comparison
How Ridgeway Components Ltd stacks up against suppliers competing for the same workloads — based on overlap with its 6 signature CPV codes over the last 24 months.
Value band:
/
CohortRidgeway Components Ltd(You)Security And Fire Experts LtdGOOM ELECTRICAL LIMITEDNiblock (Builders) LtdAviation Spares & Repairs LimitedLabquip NDT Limited
iAuto-picked from 6 signature CPV codes · last 24 months overlap
Metric | SA Security And Fire Experts Ltd Peer · rank #1 | GE GOOM ELECTRICAL LIMITED Peer · rank #2 | N( Niblock (Builders) Ltd Peer · rank #3 | RC Ridgeway Components Ltd (You) · target supplier | AS Aviation Spares & Repairs Limited Peer · rank #5 | LN Labquip NDT Limited Peer · rank #6 |
|---|---|---|---|---|---|---|
01ActivityVolume, scale, freshness | ||||||
| 12-month contractedAward value, last 12m | £2.1m | £150k | £28k | — | — | — |
| Framework headroomPer-supplier share of framework ceilings | £450k | — | — | — | — | — |
| Total awarded (lifetime)All time, all contracts | £45.2m | £78.9m | £27.5m | £1.1m(−96%) | £4.4m | £354k |
| Contracts won (12m)Distinct awards last year | 5 | 7 | 3 | — | — | |
How to read a target cell
The target column carries a delta — value compared to the peer median for that row. Direction-of-good varies by metric, so deltas are neutral.
Peer cell£499m(peer median £255m)
→
Target cell£11.7m(−97% vs median)
Money:
£N.Nm, £Nk, £N.NbnPercent: 42% · pp delta: (+12pp)Day delta: (−149 days) · missing: —