Supplier · Peer benchmark
Peer comparison
How MULTI MARQUE PRODUCTION ENGINEERING LIMITED stacks up against suppliers competing for the same workloads — based on overlap with its 2 signature CPV codes over the last 24 months.
Value band:
/
CohortMULTI MARQUE PRODUCTION ENGINEERING LIMITED(You)InstarmacChange Maker 3DNORTH EAST CONCRETE LIMITED
iAuto-picked from 2 signature CPV codes · last 24 months overlap
Metric | MM MULTI MARQUE PRODUCTION ENGINEERING LIMITED (You) · target supplier | IN Instarmac Peer · rank #2 | CM Change Maker 3D Peer · rank #3 | NE NORTH EAST CONCRETE LIMITED Peer · rank #4 |
|---|---|---|---|---|
01ActivityVolume, scale, freshness | ||||
| 12-month contractedAward value, last 12m | £27k | — | — | — |
| Framework headroomPer-supplier share of framework ceilings | — | — | — | — |
| Total awarded (lifetime)All time, all contracts | £27k(−99%) | £6.6m | £96k | £3.1m |
| Contracts won (12m)Distinct awards last year | 1 | — | — | 10 |
| Contracts (lifetime)All awards on record | 1(−94%) | 17 | 4 | 25 |
How to read a target cell
The target column carries a delta — value compared to the peer median for that row. Direction-of-good varies by metric, so deltas are neutral.
Peer cell£499m(peer median £255m)
→
Target cell£11.7m(−97% vs median)
Money:
£N.Nm, £Nk, £N.NbnPercent: 42% · pp delta: (+12pp)Day delta: (−149 days) · missing: —