Supplier · Peer benchmark
Peer comparison
How Survey Solutions stacks up against suppliers competing for the same workloads — based on overlap with its 10 signature CPV codes over the last 24 months.
Value band:
/
CohortSurvey Solutions(You)Mace Consult LimitedTaylor Woodrow Infrastructure LimitedAll Roads Asphalt Solutions LTDGalliford Try Construction LimitedAdam Smith International Ltd
iAuto-picked from 10 signature CPV codes · last 24 months overlap
Metric | MC Mace Consult Limited Peer · rank #1 | TW Taylor Woodrow Infrastructure Limited Peer · rank #2 | AR All Roads Asphalt Solutions LTD Peer · rank #3 | GT Galliford Try Construction Limited Peer · rank #4 | AS Adam Smith International Ltd Peer · rank #5 | SS Survey Solutions (You) · target supplier |
|---|---|---|---|---|---|---|
01ActivityVolume, scale, freshness | ||||||
| 12-month contractedAward value, last 12m | £71.2m | £33.0m | £10.2m | £5.1m | £2.3m | — |
| Framework headroomPer-supplier share of framework ceilings | — | — | — | — | — | — |
| Total awarded (lifetime)All time, all contracts | £738.8m | £162.5m | £14.8m | £2.1bn | £787.0m | £237k(−100%) |
| Contracts won (12m)Distinct awards last year | 18 | 10 | 7 | 13 | 1 | — |
How to read a target cell
The target column carries a delta — value compared to the peer median for that row. Direction-of-good varies by metric, so deltas are neutral.
Peer cell£499m(peer median £255m)
→
Target cell£11.7m(−97% vs median)
Money:
£N.Nm, £Nk, £N.NbnPercent: 42% · pp delta: (+12pp)Day delta: (−149 days) · missing: —