Supplier · Peer benchmark
Peer comparison
How TAYLOR WOODROW CONSTRUCTION stacks up against suppliers competing for the same workloads — based on overlap with its 2 signature CPV codes over the last 24 months.
Value band:
/
CohortTAYLOR WOODROW CONSTRUCTION(You)Balfour Beatty Civil Engineering Limited (BBCE)JP Developers LtdRingway Infrastructure Services LimitedMarlborough Highways LimitedSapphire Utility solutions
iAuto-picked from 2 signature CPV codes · last 24 months overlap
Metric | BB Balfour Beatty Civil Engineering Limited (BBCE) Peer · rank #1 | JD JP Developers Ltd Peer · rank #2 | TW TAYLOR WOODROW CONSTRUCTION (You) · target supplier | RI Ringway Infrastructure Services Limited Peer · rank #4 | MH Marlborough Highways Limited Peer · rank #5 | SU Sapphire Utility solutions Peer · rank #6 |
|---|---|---|---|---|---|---|
01ActivityVolume, scale, freshness | ||||||
| 12-month contractedAward value, last 12m | £60.0m | £614k | — | — | — | — |
| Framework headroomPer-supplier share of framework ceilings | — | — | — | £2.0bn | — | — |
| Total awarded (lifetime)All time, all contracts | £60.0m | £98.0m | £771k(−99%) | £4.8bn | £451.1m | £22.8m |
| Contracts won (12m)Distinct awards last year | 1 | 3 | — | 1 | 1 | |
How to read a target cell
The target column carries a delta — value compared to the peer median for that row. Direction-of-good varies by metric, so deltas are neutral.
Peer cell£499m(peer median £255m)
→
Target cell£11.7m(−97% vs median)
Money:
£N.Nm, £Nk, £N.NbnPercent: 42% · pp delta: (+12pp)Day delta: (−149 days) · missing: —