Supplier · Peer benchmark
Peer comparison
How NORTH EAST CONCRETE LIMITED stacks up against suppliers competing for the same workloads — based on overlap with its 11 signature CPV codes over the last 24 months. Target HQ: North East.
Value band:
/
CohortNORTH EAST CONCRETE LIMITED(You)Kier ConstructionBALFOUR BEATTY CIVIL ENGINEERING LIMITEDCLC Contractors LtdRingway Infrastructure Services LimitedHanson Quarry Products Europe Ltd T/A Hanson Contracting
iAuto-picked from 11 signature CPV codes · last 24 months overlap
Metric | KC Kier Construction Peer · rank #1 | BB BALFOUR BEATTY CIVIL ENGINEERING LIMITED Peer · rank #2 | CC CLC Contractors Ltd Peer · rank #3 | NE NORTH EAST CONCRETE LIMITED (You) · target supplier | RI Ringway Infrastructure Services Limited Peer · rank #5 | HQ Hanson Quarry Products Europe Ltd T/A Hanson Contracting Peer · rank #6 |
|---|---|---|---|---|---|---|
01ActivityVolume, scale, freshness | ||||||
| 12-month contractedAward value, last 12m | £4.3bn | £45.3m | £41.4m | — | — | — |
| Framework headroomPer-supplier share of framework ceilings | — | — | — | — | £2.0bn | — |
| Total awarded (lifetime)All time, all contracts | £12.4bn | £3.4bn | £2.7bn | £3.1m(−100%) | £4.8bn | £666.2m |
| Contracts won (12m)Distinct awards last year | 38 | 10 | 16 | 10(−23%) | 1 | |
How to read a target cell
The target column carries a delta — value compared to the peer median for that row. Direction-of-good varies by metric, so deltas are neutral.
Peer cell£499m(peer median £255m)
→
Target cell£11.7m(−97% vs median)
Money:
£N.Nm, £Nk, £N.NbnPercent: 42% · pp delta: (+12pp)Day delta: (−149 days) · missing: —