Supplier · Peer benchmark
Peer comparison
How HPW Architecture Ltd stacks up against suppliers competing for the same workloads — based on overlap with its 2 signature CPV codes over the last 24 months.
Value band:
/
CohortHPW Architecture Ltd(You)WSP UK LimitedBam Nuttall/Morgan SindallJacobs UK LtdWSP UK Ltd - SPaTS 1MTC Operations Limited
iAuto-picked from 2 signature CPV codes · last 24 months overlap
Metric | WU WSP UK Limited Peer · rank #1 | BN Bam Nuttall/Morgan Sindall Peer · rank #2 | JU Jacobs UK Ltd Peer · rank #3 | WU WSP UK Ltd - SPaTS 1 Peer · rank #4 | HA HPW Architecture Ltd (You) · target supplier | MO MTC Operations Limited Peer · rank #6 |
|---|---|---|---|---|---|---|
01ActivityVolume, scale, freshness | ||||||
| 12-month contractedAward value, last 12m | £91.2m | £64.8m | £49.2m | £2.2m | — | — |
| Framework headroomPer-supplier share of framework ceilings | £731k | £27k | £264k | — | — | — |
| Total awarded (lifetime)All time, all contracts | £2.1bn | £2.5bn | £1.4bn | £19.8m | £44k(−100%) | £3.3m |
| Contracts won (12m)Distinct awards last year | 171 | 39 | 82 | 6 | — | 1 |
How to read a target cell
The target column carries a delta — value compared to the peer median for that row. Direction-of-good varies by metric, so deltas are neutral.
Peer cell£499m(peer median £255m)
→
Target cell£11.7m(−97% vs median)
Money:
£N.Nm, £Nk, £N.NbnPercent: 42% · pp delta: (+12pp)Day delta: (−149 days) · missing: —