Supplier · Peer benchmark
Peer comparison
How DataSpace (UK) Ltd stacks up against suppliers competing for the same workloads — based on overlap with its 12 signature CPV codes over the last 24 months.
Value band:
/
CohortDataSpace (UK) Ltd(You)KPMG LLPSpecialist computer centresIRON MOUNTAIN (UK) PLCGXORefer to the attachments area
iAuto-picked from 12 signature CPV codes · last 24 months overlap
Metric | KP KPMG LLP Peer · rank #1 | SC Specialist computer centres Peer · rank #2 | IM IRON MOUNTAIN (UK) PLC Peer · rank #3 | D( DataSpace (UK) Ltd (You) · target supplier | GX GXO Peer · rank #5 | RT Refer to the attachments area Peer · rank #6 |
|---|---|---|---|---|---|---|
01ActivityVolume, scale, freshness | ||||||
| 12-month contractedAward value, last 12m | £323.1m | £125.7m | £20.1m | — | — | — |
| Framework headroomPer-supplier share of framework ceilings | £44.5m | £2.3m | £1.5m | — | — | — |
| Total awarded (lifetime)All time, all contracts | £4.7bn | £1.0bn | £574.3m | £11.7m(−99%) | £4.2bn | £2.0bn |
| Contracts won (12m)Distinct awards last year | 97 | 114 | 12 | — | — | |
How to read a target cell
The target column carries a delta — value compared to the peer median for that row. Direction-of-good varies by metric, so deltas are neutral.
Peer cell£499m(peer median £255m)
→
Target cell£11.7m(−97% vs median)
Money:
£N.Nm, £Nk, £N.NbnPercent: 42% · pp delta: (+12pp)Day delta: (−149 days) · missing: —