Supplier · Peer benchmark
Peer comparison
How Wilkinson Eyre Architects Ltd stacks up against suppliers competing for the same workloads — based on overlap with its 5 signature CPV codes over the last 24 months. Target HQ: London.
Value band:
/
CohortWilkinson Eyre Architects Ltd(You)Mace Consult LimitedMOTT MACDONALD LIMITEDTurner & Townsend Project Management LtdCityAxis LimitedAleon Limited (appointed to Lot 2)
iAuto-picked from 5 signature CPV codes · last 24 months overlap
Metric | MC Mace Consult Limited Peer · rank #1 | MM MOTT MACDONALD LIMITED Peer · rank #2 | T& Turner & Townsend Project Management Ltd Peer · rank #3 | WE Wilkinson Eyre Architects Ltd (You) · target supplier | CI CityAxis Limited Peer · rank #5 | AL Aleon Limited (appointed to Lot 2) Peer · rank #6 |
|---|---|---|---|---|---|---|
01ActivityVolume, scale, freshness | ||||||
| 12-month contractedAward value, last 12m | £70.7m | £61.7m | £44.3m | — | — | — |
| Framework headroomPer-supplier share of framework ceilings | £2.6m | £22k | — | — | — | £2.4m |
| Total awarded (lifetime)All time, all contracts | £738.3m | £1.5bn | £521.8m | £1.1m(−100%) | £71.7m | £16.7m |
| Contracts won (12m)Distinct awards last year | 15 | 77 | 23 | — | — | |
How to read a target cell
The target column carries a delta — value compared to the peer median for that row. Direction-of-good varies by metric, so deltas are neutral.
Peer cell£499m(peer median £255m)
→
Target cell£11.7m(−97% vs median)
Money:
£N.Nm, £Nk, £N.NbnPercent: 42% · pp delta: (+12pp)Day delta: (−149 days) · missing: —