Supplier · Peer benchmark
Peer comparison
How Cenex (Centre of Excellence for Low Carbon & Fuel Cell Technologies) stacks up against suppliers competing for the same workloads — based on overlap with its 20 signature CPV codes over the last 24 months.
Value band:
/
CohortCenex (Centre of Excellence for Low Carbon & Fuel Cell Technologies)(You)Mace Consult LimitedCONNOR CONSTRUCTION (SOUTH WEST) LIMITEDCore Control SolutionStone Technologies Ltd t/a Converge Technology Solutions UK LtdLORNE STEWART PLC
iAuto-picked from 20 signature CPV codes · last 24 months overlap
Metric | MC Mace Consult Limited Peer · rank #1 | CC CONNOR CONSTRUCTION (SOUTH WEST) LIMITED Peer · rank #2 | C( Cenex (Centre of Excellence for Low Carbon & Fuel Cell Technologies) (You) · target supplier | CC Core Control Solution Peer · rank #4 | ST | LS LORNE STEWART PLC Peer · rank #6 |
|---|---|---|---|---|---|---|
01ActivityVolume, scale, freshness | ||||||
| 12-month contractedAward value, last 12m | £70.7m | £11.1m | — | — | — | — |
| Framework headroomPer-supplier share of framework ceilings | £2.6m | — | — | £18.8m | — | £40.0m |
| Total awarded (lifetime)All time, all contracts | £738.3m | £62.1m | — | £46.4m | £10.0m | £343.8m |
| Contracts won (12m)Distinct awards last year | 15 | 3 | — | 1 | — | 10 |
How to read a target cell
The target column carries a delta — value compared to the peer median for that row. Direction-of-good varies by metric, so deltas are neutral.
Peer cell£499m(peer median £255m)
→
Target cell£11.7m(−97% vs median)
Money:
£N.Nm, £Nk, £N.NbnPercent: 42% · pp delta: (+12pp)Day delta: (−149 days) · missing: —