Supplier · Peer benchmark
Peer comparison
How HUT Architecture Ltd stacks up against suppliers competing for the same workloads — based on overlap with its 3 signature CPV codes over the last 24 months.
Value band:
/
CohortHUT Architecture Ltd(You)Kier ConstructionWillmott Dixon Construction LimitedBowmer + Kirkland LimitedWillmott Dixon Construction LtdSMG UK Ltd t/a ASM Global
iAuto-picked from 3 signature CPV codes · last 24 months overlap
Metric | KC Kier Construction Peer · rank #1 | WD Willmott Dixon Construction Limited Peer · rank #2 | B+ Bowmer + Kirkland Limited Peer · rank #3 | WD Willmott Dixon Construction Ltd Peer · rank #4 | HA HUT Architecture Ltd (You) · target supplier | SU SMG UK Ltd t/a ASM Global Peer · rank #6 |
|---|---|---|---|---|---|---|
01ActivityVolume, scale, freshness | ||||||
| 12-month contractedAward value, last 12m | £4.3bn | £4.2bn | £856.7m | £26.5m | — | — |
| Framework headroomPer-supplier share of framework ceilings | — | £26.5m | — | — | — | — |
| Total awarded (lifetime)All time, all contracts | £12.4bn | £11.7bn | £4.3bn | £26.5m | £36k(−100%) | £328.5m |
| Contracts won (12m)Distinct awards last year | 35 | 37 | 42 | 5 | — | |
How to read a target cell
The target column carries a delta — value compared to the peer median for that row. Direction-of-good varies by metric, so deltas are neutral.
Peer cell£499m(peer median £255m)
→
Target cell£11.7m(−97% vs median)
Money:
£N.Nm, £Nk, £N.NbnPercent: 42% · pp delta: (+12pp)Day delta: (−149 days) · missing: —