Supplier · Peer benchmark
Peer comparison
How DK Hughes Energy Saving Solutions Ltd stacks up against suppliers competing for the same workloads — based on overlap with its 20 signature CPV codes over the last 24 months.
Value band:
/
CohortDK Hughes Energy Saving Solutions Ltd(You)Kier ConstructionDodd GroupJohn Sisk and Son LtdCITY PLUMBING SUPPLIES HOLDINGS LIMITEDCHAR.GY LIMITED
iAuto-picked from 20 signature CPV codes · last 24 months overlap
Metric | KC Kier Construction Peer · rank #1 | DG Dodd Group Peer · rank #2 | JS John Sisk and Son Ltd Peer · rank #3 | CP CITY PLUMBING SUPPLIES HOLDINGS LIMITED Peer · rank #4 | DH DK Hughes Energy Saving Solutions Ltd (You) · target supplier | CH CHAR.GY LIMITED Peer · rank #6 |
|---|---|---|---|---|---|---|
01ActivityVolume, scale, freshness | ||||||
| 12-month contractedAward value, last 12m | £4.3bn | £18.1m | £4.6m | £2.1m | — | — |
| Framework headroomPer-supplier share of framework ceilings | — | — | — | — | — | £7.0m |
| Total awarded (lifetime)All time, all contracts | £12.5bn | £18.1m | £271.7m | £149.2m | £37.5m(−75%) | £27.2m |
| Contracts won (12m)Distinct awards last year | 35 | 1 | 1 | 7 | — | 8 |
How to read a target cell
The target column carries a delta — value compared to the peer median for that row. Direction-of-good varies by metric, so deltas are neutral.
Peer cell£499m(peer median £255m)
→
Target cell£11.7m(−97% vs median)
Money:
£N.Nm, £Nk, £N.NbnPercent: 42% · pp delta: (+12pp)Day delta: (−149 days) · missing: —