Supplier · Peer benchmark
Peer comparison
How Core Control Solutions Limited stacks up against suppliers competing for the same workloads — based on overlap with its 20 signature CPV codes over the last 24 months. Target HQ: North West.
Value band:
/
CohortCore Control Solutions Limited(You)SoftcatGalliford Try Construction LimitedCONNOR CONSTRUCTION (SOUTH WEST) LIMITEDRingway Infrastructure Services LimitedScott Aerospace
iAuto-picked from 20 signature CPV codes · last 24 months overlap
Metric | SO Softcat Peer · rank #1 | GT Galliford Try Construction Limited Peer · rank #2 | CC CONNOR CONSTRUCTION (SOUTH WEST) LIMITED Peer · rank #3 | CC Core Control Solutions Limited (You) · target supplier | RI Ringway Infrastructure Services Limited Peer · rank #5 | SA Scott Aerospace Peer · rank #6 |
|---|---|---|---|---|---|---|
01ActivityVolume, scale, freshness | ||||||
| 12-month contractedAward value, last 12m | £453.7m | £189.7m | £11.1m | £9.5m(−95%) | — | — |
| Framework headroomPer-supplier share of framework ceilings | £48.3m | — | — | — | £2.0bn | — |
| Total awarded (lifetime)All time, all contracts | £1.6bn | £1.9bn | £62.1m | £17.1m(−99%) | £4.8bn | £90.1m |
| Contracts won (12m)Distinct awards last year | 479 | 11 | 3 | 2(−60%) | ||
How to read a target cell
The target column carries a delta — value compared to the peer median for that row. Direction-of-good varies by metric, so deltas are neutral.
Peer cell£499m(peer median £255m)
→
Target cell£11.7m(−97% vs median)
Money:
£N.Nm, £Nk, £N.NbnPercent: 42% · pp delta: (+12pp)Day delta: (−149 days) · missing: —