Supplier · Peer benchmark
Peer comparison
How Upper Cut Productions stacks up against suppliers competing for the same workloads — based on overlap with its 9 signature CPV codes over the last 24 months.
Value band:
/
CohortUpper Cut Productions(You)Ridge and Partners LLPCalfordSeadenSTANTEC UK LIMITEDAHR ARCHITECTS LIMITEDHawkins\Brown
iAuto-picked from 9 signature CPV codes · last 24 months overlap
Metric | RA Ridge and Partners LLP Peer · rank #1 | CA CalfordSeaden Peer · rank #2 | SU STANTEC UK LIMITED Peer · rank #3 | UC Upper Cut Productions (You) · target supplier | AA AHR ARCHITECTS LIMITED Peer · rank #5 | HA Hawkins\Brown Peer · rank #6 |
|---|---|---|---|---|---|---|
01ActivityVolume, scale, freshness | ||||||
| 12-month contractedAward value, last 12m | £9.3m | £3.0m | £1.1m | — | — | — |
| Framework headroomPer-supplier share of framework ceilings | £59k | — | — | — | £42k | £42k |
| Total awarded (lifetime)All time, all contracts | £208.9m | £152.6m | £115.0m | £0.06(−100%) | £92.1m | £27.1m |
| Contracts won (12m)Distinct awards last year | 41 | 10 | 23 | — | 4 | 1 |
How to read a target cell
The target column carries a delta — value compared to the peer median for that row. Direction-of-good varies by metric, so deltas are neutral.
Peer cell£499m(peer median £255m)
→
Target cell£11.7m(−97% vs median)
Money:
£N.Nm, £Nk, £N.NbnPercent: 42% · pp delta: (+12pp)Day delta: (−149 days) · missing: —