Supplier · Peer benchmark
Peer comparison
How Blackburn Marshall Construction (NE) Ltd stacks up against suppliers competing for the same workloads — based on overlap with its 1 signature CPV code over the last 24 months.
Value band:
/
CohortBlackburn Marshall Construction (NE) Ltd(You)Willmott Dixon Construction LimitedR. BENSON PROPERTY MAINTENANCE LIMITEDMEARS LIMITEDBELL GROUP UK LIMITEDHENRY BROTHERS (MAGHERAFELT) LIMITED
iAuto-picked from 1 signature CPV code · last 24 months overlap
Metric | WD Willmott Dixon Construction Limited Peer · rank #1 | RB R. BENSON PROPERTY MAINTENANCE LIMITED Peer · rank #2 | ME MEARS LIMITED Peer · rank #3 | BG BELL GROUP UK LIMITED Peer · rank #4 | BM Blackburn Marshall Construction (NE) Ltd (You) · target supplier | HB HENRY BROTHERS (MAGHERAFELT) LIMITED Peer · rank #6 |
|---|---|---|---|---|---|---|
01ActivityVolume, scale, freshness | ||||||
| 12-month contractedAward value, last 12m | £4.2bn | £40.1m | £29.5m | £12.4m | — | — |
| Framework headroomPer-supplier share of framework ceilings | £26.5m | — | — | — | — | — |
| Total awarded (lifetime)All time, all contracts | £11.7bn | £110.6m | £4.2bn | £379.3m | £296k(−100%) | £29.8m |
| Contracts won (12m)Distinct awards last year | 38 | 4 | 5 | 11 | — | |
How to read a target cell
The target column carries a delta — value compared to the peer median for that row. Direction-of-good varies by metric, so deltas are neutral.
Peer cell£499m(peer median £255m)
→
Target cell£11.7m(−97% vs median)
Money:
£N.Nm, £Nk, £N.NbnPercent: 42% · pp delta: (+12pp)Day delta: (−149 days) · missing: —