Supplier · Peer benchmark
Peer comparison
How HORNBECK LTD stacks up against suppliers competing for the same workloads — based on overlap with its 4 signature CPV codes over the last 24 months. Target HQ: Eastern.
Value band:
/
CohortHORNBECK LTD(You)Kier ConstructionBowmer + Kirkland LimitedSWARCO UK & IRELAND LTDColas LtdP. DUCKER SYSTEMS LIMITED
iAuto-picked from 4 signature CPV codes · last 24 months overlap
Metric | KC Kier Construction Peer · rank #1 | B+ Bowmer + Kirkland Limited Peer · rank #2 | SU SWARCO UK & IRELAND LTD Peer · rank #3 | CO Colas Ltd Peer · rank #4 | PD P. DUCKER SYSTEMS LIMITED Peer · rank #5 | HO HORNBECK LTD (You) · target supplier |
|---|---|---|---|---|---|---|
01ActivityVolume, scale, freshness | ||||||
| 12-month contractedAward value, last 12m | £4.3bn | £849.3m | £105.9m | £69.2m | £37.7m | — |
| Framework headroomPer-supplier share of framework ceilings | — | — | — | — | — | — |
| Total awarded (lifetime)All time, all contracts | £12.4bn | £2.7bn | £203.7m | £2.0bn | £65.5m | £265k(−100%) |
| Contracts won (12m)Distinct awards last year | 38 | 39 | 22 | 35 | 3 | 1 |
How to read a target cell
The target column carries a delta — value compared to the peer median for that row. Direction-of-good varies by metric, so deltas are neutral.
Peer cell£499m(peer median £255m)
→
Target cell£11.7m(−97% vs median)
Money:
£N.Nm, £Nk, £N.NbnPercent: 42% · pp delta: (+12pp)Day delta: (−149 days) · missing: —