Supplier · Peer benchmark
Peer comparison
How Whitwam Ltd stacks up against suppliers competing for the same workloads — based on overlap with its 4 signature CPV codes over the last 24 months.
Value band:
/
CohortWhitwam Ltd(You)CDW UK LtdCOMPUTACENTER (UK) LIMITEDSyncGETECH LIMITEDComputer Network Defence Limited
iAuto-picked from 4 signature CPV codes · last 24 months overlap
Metric | CU CDW UK Ltd Peer · rank #1 | C( COMPUTACENTER (UK) LIMITED Peer · rank #2 | SY Sync Peer · rank #3 | GE GETECH LIMITED Peer · rank #4 | CN Computer Network Defence Limited Peer · rank #5 | WH Whitwam Ltd (You) · target supplier |
|---|---|---|---|---|---|---|
01ActivityVolume, scale, freshness | ||||||
| 12-month contractedAward value, last 12m | £202.2m | £96.6m | £5.8m | £3.8m | £2.1m | — |
| Framework headroomPer-supplier share of framework ceilings | £123k | £7.5m | — | £298k | — | — |
| Total awarded (lifetime)All time, all contracts | £1.3bn | £1.4bn | £6.9m | £103.3m | £4.2m | £72k(−100%) |
| Contracts won (12m)Distinct awards last year | 126 | 93 | 3 | 14 | 1 | — |
How to read a target cell
The target column carries a delta — value compared to the peer median for that row. Direction-of-good varies by metric, so deltas are neutral.
Peer cell£499m(peer median £255m)
→
Target cell£11.7m(−97% vs median)
Money:
£N.Nm, £Nk, £N.NbnPercent: 42% · pp delta: (+12pp)Day delta: (−149 days) · missing: —