Supplier · Peer benchmark
Peer comparison
How BIM ACADEMY (ENTERPRISES) LIMITED stacks up against suppliers competing for the same workloads — based on overlap with its 20 signature CPV codes over the last 24 months.
Value band:
/
CohortBIM ACADEMY (ENTERPRISES) LIMITED(You)Potter Raper PartnershipWates Construction LimitedMace Consult LimitedAIREY MILLER LIMITEDGalliford Try Construction Limited
iAuto-picked from 20 signature CPV codes · last 24 months overlap
Metric | PR Potter Raper Partnership Peer · rank #1 | WC Wates Construction Limited Peer · rank #2 | MC Mace Consult Limited Peer · rank #3 | AM AIREY MILLER LIMITED Peer · rank #4 | GT Galliford Try Construction Limited Peer · rank #5 | BA BIM ACADEMY (ENTERPRISES) LIMITED (You) · target supplier |
|---|---|---|---|---|---|---|
01ActivityVolume, scale, freshness | ||||||
| 12-month contractedAward value, last 12m | £412.6m | £251.4m | £91.6m | £11.2m | £5.1m | — |
| Framework headroomPer-supplier share of framework ceilings | — | £32.8m | — | £9.0m | — | — |
| Total awarded (lifetime)All time, all contracts | £506.5m | £7.1bn | £759.3m | £132.4m | £2.1bn | £702k(−100%) |
| Contracts won (12m)Distinct awards last year | 1 | 20 | 19 | 9 | 14 | 1 |
How to read a target cell
The target column carries a delta — value compared to the peer median for that row. Direction-of-good varies by metric, so deltas are neutral.
Peer cell£499m(peer median £255m)
→
Target cell£11.7m(−97% vs median)
Money:
£N.Nm, £Nk, £N.NbnPercent: 42% · pp delta: (+12pp)Day delta: (−149 days) · missing: —