Supplier · Peer benchmark
Peer comparison
How MAC Construction Consultants Ltd stacks up against suppliers competing for the same workloads — based on overlap with its 20 signature CPV codes over the last 24 months.
Value band:
/
CohortMAC Construction Consultants Ltd(You)BALFOUR BEATTY CIVIL ENGINEERING LIMITEDMERRICK AND COMPANYKier Integrated ServicesWALTER LILLY & CO. LIMITEDM GROUP HIGHWAYS LIMITED
iAuto-picked from 20 signature CPV codes · last 24 months overlap
Metric | BB BALFOUR BEATTY CIVIL ENGINEERING LIMITED Peer · rank #1 | MA MERRICK AND COMPANY Peer · rank #2 | KI Kier Integrated Services Peer · rank #3 | WL WALTER LILLY & CO. LIMITED Peer · rank #4 | MC MAC Construction Consultants Ltd (You) · target supplier | MG M GROUP HIGHWAYS LIMITED Peer · rank #6 |
|---|---|---|---|---|---|---|
01ActivityVolume, scale, freshness | ||||||
| 12-month contractedAward value, last 12m | £170.3m | £25.3m | £15.1m | £8.2m | £120k(−99%) | — |
| Framework headroomPer-supplier share of framework ceilings | — | — | — | — | — | £121.8m |
| Total awarded (lifetime)All time, all contracts | £3.5bn | £25.3m | £1.7bn | £60.9m | £43.8m(−64%) | £121.8m |
| Contracts won (12m)Distinct awards last year | 10 | 2 | 8 | 3 | 1(−80%) | |
How to read a target cell
The target column carries a delta — value compared to the peer median for that row. Direction-of-good varies by metric, so deltas are neutral.
Peer cell£499m(peer median £255m)
→
Target cell£11.7m(−97% vs median)
Money:
£N.Nm, £Nk, £N.NbnPercent: 42% · pp delta: (+12pp)Day delta: (−149 days) · missing: —