Supplier · Peer benchmark
Peer comparison
How Ecosafe Heating Limited T/A Ecosafe Group stacks up against suppliers competing for the same workloads — based on overlap with its 20 signature CPV codes over the last 24 months. Target HQ: South West.
Value band:
/
CohortEcosafe Heating Limited T/A Ecosafe Group(You)Kier ConstructionInfinity Fire Prevention LtdPRB EstatesLIVGREEN FUTURES LIMITEDSentry Doors Limited
iAuto-picked from 20 signature CPV codes · last 24 months overlap
Metric | KC Kier Construction Peer · rank #1 | EH Ecosafe Heating Limited T/A Ecosafe Group (You) · target supplier | IF Infinity Fire Prevention Ltd Peer · rank #3 | PE PRB Estates Peer · rank #4 | LF LIVGREEN FUTURES LIMITED Peer · rank #5 | SD Sentry Doors Limited Peer · rank #6 |
|---|---|---|---|---|---|---|
01ActivityVolume, scale, freshness | ||||||
| 12-month contractedAward value, last 12m | £4.3bn | £30.8m(+663%) | £4.0m | £3.9m | — | — |
| Framework headroomPer-supplier share of framework ceilings | — | — | — | — | — | — |
| Total awarded (lifetime)All time, all contracts | £12.6bn | £57.7m(+343%) | £4.5m | £13.0m | £97.1m | £6.0m |
| Contracts won (12m)Distinct awards last year | 37 | 3(+100%) | 1 | 1 | ||
How to read a target cell
The target column carries a delta — value compared to the peer median for that row. Direction-of-good varies by metric, so deltas are neutral.
Peer cell£499m(peer median £255m)
→
Target cell£11.7m(−97% vs median)
Money:
£N.Nm, £Nk, £N.NbnPercent: 42% · pp delta: (+12pp)Day delta: (−149 days) · missing: —