Supplier · Peer benchmark
Peer comparison
How Karma Electrical and Fire Systems Limited stacks up against suppliers competing for the same workloads — based on overlap with its 4 signature CPV codes over the last 24 months. Target HQ: Eastern.
Value band:
/
CohortKarma Electrical and Fire Systems Limited(You)PFL Electrical LtdTSQUARED P2 LIMITEDNRT Group (registered as NRT Building Services Group Ltd.)Ameresco LimitedLORNE STEWART PLC
iAuto-picked from 4 signature CPV codes · last 24 months overlap
Metric | PE PFL Electrical Ltd Peer · rank #1 | KE Karma Electrical and Fire Systems Limited (You) · target supplier | TP TSQUARED P2 LIMITED Peer · rank #3 | NG | AM Ameresco Limited Peer · rank #5 | LS LORNE STEWART PLC Peer · rank #6 |
|---|---|---|---|---|---|---|
01ActivityVolume, scale, freshness | ||||||
| 12-month contractedAward value, last 12m | £2.1m | — | — | — | — | — |
| Framework headroomPer-supplier share of framework ceilings | — | — | — | — | — | £40.0m |
| Total awarded (lifetime)All time, all contracts | £71.7m | £2.5m(−97%) | £20.6m | £13.8m | £2.1bn | £343.8m |
| Contracts won (12m)Distinct awards last year | 7 | — | — | — | 1 | |
How to read a target cell
The target column carries a delta — value compared to the peer median for that row. Direction-of-good varies by metric, so deltas are neutral.
Peer cell£499m(peer median £255m)
→
Target cell£11.7m(−97% vs median)
Money:
£N.Nm, £Nk, £N.NbnPercent: 42% · pp delta: (+12pp)Day delta: (−149 days) · missing: —