Supplier · Peer benchmark
Peer comparison
How IMPERIAL COLLEGE PROJECTS LTD stacks up against suppliers competing for the same workloads — based on overlap with its 12 signature CPV codes over the last 24 months. Target HQ: London.
Value band:
/
CohortIMPERIAL COLLEGE PROJECTS LTD(You)Suez Recycling and Recovery UK LtdBMG RESEARCH LTDUniversity of WarwickNaibUniversity of York - Research Grants
iAuto-picked from 12 signature CPV codes · last 24 months overlap
Metric | SR Suez Recycling and Recovery UK Ltd Peer · rank #1 | BR BMG RESEARCH LTD Peer · rank #2 | IC IMPERIAL COLLEGE PROJECTS LTD (You) · target supplier | UO University of Warwick Peer · rank #4 | NA Naib Peer · rank #5 | UO University of York - Research Grants Peer · rank #6 |
|---|---|---|---|---|---|---|
01ActivityVolume, scale, freshness | ||||||
| 12-month contractedAward value, last 12m | £1.8m | £1.7m | £1.3m(+17%) | £537k | £251k | — |
| Framework headroomPer-supplier share of framework ceilings | £89k | — | — | — | £266k | — |
| Total awarded (lifetime)All time, all contracts | £802.9m | £30.8m | £314.7m(+1423%) | £20.7m | £12.2m | £3.7m |
| Contracts won (12m)Distinct awards last year | 24 | 13 | 2(−79%) | 4 | 6 | |
How to read a target cell
The target column carries a delta — value compared to the peer median for that row. Direction-of-good varies by metric, so deltas are neutral.
Peer cell£499m(peer median £255m)
→
Target cell£11.7m(−97% vs median)
Money:
£N.Nm, £Nk, £N.NbnPercent: 42% · pp delta: (+12pp)Day delta: (−149 days) · missing: —