Supplier · Peer benchmark
Peer comparison
How Elliott Projects (Consultancy) Limited stacks up against suppliers competing for the same workloads — based on overlap with its 12 signature CPV codes over the last 24 months.
Value band:
/
CohortElliott Projects (Consultancy) Limited(You)AECOM LIMITEDJacobs UK LtdAtkins Realis PPSArcadis LLPPRP
iAuto-picked from 12 signature CPV codes · last 24 months overlap
Metric | AE AECOM LIMITED Peer · rank #1 | JU Jacobs UK Ltd Peer · rank #2 | AR Atkins Realis PPS Peer · rank #3 | AR Arcadis LLP Peer · rank #4 | PR PRP Peer · rank #5 | EP Elliott Projects (Consultancy) Limited (You) · target supplier |
|---|---|---|---|---|---|---|
01ActivityVolume, scale, freshness | ||||||
| 12-month contractedAward value, last 12m | £223.8m | £46.5m | £9.0m | £5.2m | £218k | — |
| Framework headroomPer-supplier share of framework ceilings | £5.5m | £264k | £19k | — | — | — |
| Total awarded (lifetime)All time, all contracts | £834.6m | £1.4bn | £41.4m | £469.2m | £101.6m | — |
| Contracts won (12m)Distinct awards last year | 144 | 77 | 20 | 14 | 1 | — |
How to read a target cell
The target column carries a delta — value compared to the peer median for that row. Direction-of-good varies by metric, so deltas are neutral.
Peer cell£499m(peer median £255m)
→
Target cell£11.7m(−97% vs median)
Money:
£N.Nm, £Nk, £N.NbnPercent: 42% · pp delta: (+12pp)Day delta: (−149 days) · missing: —