Supplier · Peer benchmark
Peer comparison
How Gal Power stacks up against suppliers competing for the same workloads — based on overlap with its 1 signature CPV code over the last 24 months.
Value band:
/
CohortGal Power(You)High Voltage Power Systems LimitedBELLS POWER SERVICES LTDLAMBDA PHOTOMETRICS LIMITEDArfon Rewinds Ltd
iAuto-picked from 1 signature CPV code · last 24 months overlap
Metric | GP Gal Power (You) · target supplier | HV High Voltage Power Systems Limited Peer · rank #2 | BP BELLS POWER SERVICES LTD Peer · rank #3 | LP LAMBDA PHOTOMETRICS LIMITED Peer · rank #4 | AR Arfon Rewinds Ltd Peer · rank #5 |
|---|---|---|---|---|---|
01ActivityVolume, scale, freshness | |||||
| 12-month contractedAward value, last 12m | — | — | — | — | — |
| Framework headroomPer-supplier share of framework ceilings | — | — | — | — | — |
| Total awarded (lifetime)All time, all contracts | £26k(−98%) | £155k | £4.8m | £3.0m | £81k |
| Contracts won (12m)Distinct awards last year | — | 1 | — | 2 | — |
| Contracts (lifetime)All awards on record | 1 | ||||
How to read a target cell
The target column carries a delta — value compared to the peer median for that row. Direction-of-good varies by metric, so deltas are neutral.
Peer cell£499m(peer median £255m)
→
Target cell£11.7m(−97% vs median)
Money:
£N.Nm, £Nk, £N.NbnPercent: 42% · pp delta: (+12pp)Day delta: (−149 days) · missing: —