Supplier · Peer benchmark
Peer comparison
How 3 Phase Electrical Contractors Ltd stacks up against suppliers competing for the same workloads — based on overlap with its 2 signature CPV codes over the last 24 months.
Value band:
/
Cohort3 Phase Electrical Contractors Ltd(You)Re-Gen (M&E Services) LtdMEARS LIMITEDPilon LimitedNRT BUILDING SERVICES GROUP LIMITEDAlternative Heat Ltd
iAuto-picked from 2 signature CPV codes · last 24 months overlap
Metric | R( Re-Gen (M&E Services) Ltd Peer · rank #1 | ME MEARS LIMITED Peer · rank #2 | PI Pilon Limited Peer · rank #3 | NB NRT BUILDING SERVICES GROUP LIMITED Peer · rank #4 | 3P 3 Phase Electrical Contractors Ltd (You) · target supplier | AH Alternative Heat Ltd Peer · rank #6 |
|---|---|---|---|---|---|---|
01ActivityVolume, scale, freshness | ||||||
| 12-month contractedAward value, last 12m | £258.9m | £29.5m | £6.7m | £2.2m | — | — |
| Framework headroomPer-supplier share of framework ceilings | £131k | — | — | — | — | — |
| Total awarded (lifetime)All time, all contracts | £281.9m | £4.2bn | £280.3m | £16.6m | — | £168.7m |
| Contracts won (12m)Distinct awards last year | 13 | 5 | 4 | 6 | — | 1 |
How to read a target cell
The target column carries a delta — value compared to the peer median for that row. Direction-of-good varies by metric, so deltas are neutral.
Peer cell£499m(peer median £255m)
→
Target cell£11.7m(−97% vs median)
Money:
£N.Nm, £Nk, £N.NbnPercent: 42% · pp delta: (+12pp)Day delta: (−149 days) · missing: —