Supplier · Peer benchmark
Peer comparison
How AAE Electrical stacks up against suppliers competing for the same workloads — based on overlap with its 12 signature CPV codes over the last 24 months.
Value band:
/
CohortAAE Electrical(You)Stone Technologies Ltd t/a Converge Technology SolutionsW.G.Wigginton LtdCHAR.GY LIMITEDLORNE STEWART PLCBlack Pear Electrical
iAuto-picked from 12 signature CPV codes · last 24 months overlap
Metric | ST Stone Technologies Ltd t/a Converge Technology Solutions Peer · rank #1 | W. W.G.Wigginton Ltd Peer · rank #2 | AE AAE Electrical (You) · target supplier | CH CHAR.GY LIMITED Peer · rank #4 | LS LORNE STEWART PLC Peer · rank #5 | BP Black Pear Electrical Peer · rank #6 |
|---|---|---|---|---|---|---|
01ActivityVolume, scale, freshness | ||||||
| 12-month contractedAward value, last 12m | £3.8m | £971k | — | — | — | — |
| Framework headroomPer-supplier share of framework ceilings | — | — | — | £7.0m | — | — |
| Total awarded (lifetime)All time, all contracts | £14.0m | £60.8m | — | £27.2m | £343.8m | £723k |
| Contracts won (12m)Distinct awards last year | 14 | 2 | — | 8 | 9 | — |
How to read a target cell
The target column carries a delta — value compared to the peer median for that row. Direction-of-good varies by metric, so deltas are neutral.
Peer cell£499m(peer median £255m)
→
Target cell£11.7m(−97% vs median)
Money:
£N.Nm, £Nk, £N.NbnPercent: 42% · pp delta: (+12pp)Day delta: (−149 days) · missing: —