Supplier · Peer benchmark
Peer comparison
How J Davis & Son Grounds Maintenance Contractors stacks up against suppliers competing for the same workloads — based on overlap with its 5 signature CPV codes over the last 24 months.
Value band:
/
CohortJ Davis & Son Grounds Maintenance Contractors(You)Kier ConstructionESH CONSTRUCTION LIMITEDHenry Boot Construction LimitedJACKSON CIVIL ENGINEERING GROUP LIMITEDBreheny Civil Engineering
iAuto-picked from 5 signature CPV codes · last 24 months overlap
Metric | KC Kier Construction Peer · rank #1 | EC ESH CONSTRUCTION LIMITED Peer · rank #2 | HB Henry Boot Construction Limited Peer · rank #3 | JC JACKSON CIVIL ENGINEERING GROUP LIMITED Peer · rank #4 | BC Breheny Civil Engineering Peer · rank #5 | JD J Davis & Son Grounds Maintenance Contractors (You) · target supplier |
|---|---|---|---|---|---|---|
01ActivityVolume, scale, freshness | ||||||
| 12-month contractedAward value, last 12m | £4.3bn | £83.7m | £22.7m | £17.6m | £6.1m | — |
| Framework headroomPer-supplier share of framework ceilings | — | £1.0m | — | — | £95k | — |
| Total awarded (lifetime)All time, all contracts | £12.4bn | £1.5bn | £775.5m | £1.2bn | £246.5m | — |
| Contracts won (12m)Distinct awards last year | 36 | 27 | 4 | 7 | 29 | — |
How to read a target cell
The target column carries a delta — value compared to the peer median for that row. Direction-of-good varies by metric, so deltas are neutral.
Peer cell£499m(peer median £255m)
→
Target cell£11.7m(−97% vs median)
Money:
£N.Nm, £Nk, £N.NbnPercent: 42% · pp delta: (+12pp)Day delta: (−149 days) · missing: —