Supplier · Peer benchmark
Peer comparison
How Read Construction stacks up against suppliers competing for the same workloads — based on overlap with its 2 signature CPV codes over the last 24 months.
Value band:
/
CohortRead Construction(You)Lindum Group LimitedAnchor Pipework LtdRISE ADAPTATIONS LIMITED
iAuto-picked from 2 signature CPV codes · last 24 months overlap
Metric | LG Lindum Group Limited Peer · rank #1 | AP Anchor Pipework Ltd Peer · rank #2 | RA RISE ADAPTATIONS LIMITED Peer · rank #3 | RC Read Construction (You) · target supplier |
|---|---|---|---|---|
01ActivityVolume, scale, freshness | ||||
| 12-month contractedAward value, last 12m | £20.9m | £796k | £107k | — |
| Framework headroomPer-supplier share of framework ceilings | £6.5m | — | — | — |
| Total awarded (lifetime)All time, all contracts | £399.2m | £7.2m | £2.0m | £6.0m(−17%) |
| Contracts won (12m)Distinct awards last year | 41 | 12 | 2 | — |
| Contracts (lifetime)All awards on record | 282 | 62 | 18 | 1(−98%) |
How to read a target cell
The target column carries a delta — value compared to the peer median for that row. Direction-of-good varies by metric, so deltas are neutral.
Peer cell£499m(peer median £255m)
→
Target cell£11.7m(−97% vs median)
Money:
£N.Nm, £Nk, £N.NbnPercent: 42% · pp delta: (+12pp)Day delta: (−149 days) · missing: —