Supplier · Peer benchmark
Peer comparison
How London Borough of Haringey stacks up against suppliers competing for the same workloads — based on overlap with its 3 signature CPV codes over the last 24 months.
Value band:
/
CohortLondon Borough of Haringey(You)EDF ENERGYReward Gateway (UK) LimitedVenture Independent School LtdVIX TECHNOLOGY UK LIMITEDVCARE-24 LIMITED
iAuto-picked from 3 signature CPV codes · last 24 months overlap
Metric | EE EDF ENERGY Peer · rank #1 | RG Reward Gateway (UK) Limited Peer · rank #2 | VI Venture Independent School Ltd Peer · rank #3 | VT VIX TECHNOLOGY UK LIMITED Peer · rank #4 | VC VCARE-24 LIMITED Peer · rank #5 | LB London Borough of Haringey (You) · target supplier |
|---|---|---|---|---|---|---|
01ActivityVolume, scale, freshness | ||||||
| 12-month contractedAward value, last 12m | £32.5m | £18.1m | £4.8m | £932k | £817k | — |
| Framework headroomPer-supplier share of framework ceilings | £1.4m | — | — | — | — | — |
| Total awarded (lifetime)All time, all contracts | £766.8m | £96.5m | £4.8m | £21.6m | £817k | £2.4m(−89%) |
| Contracts won (12m)Distinct awards last year | 10 | 20 | 1 | 8 | 1 | 1 |
How to read a target cell
The target column carries a delta — value compared to the peer median for that row. Direction-of-good varies by metric, so deltas are neutral.
Peer cell£499m(peer median £255m)
→
Target cell£11.7m(−97% vs median)
Money:
£N.Nm, £Nk, £N.NbnPercent: 42% · pp delta: (+12pp)Day delta: (−149 days) · missing: —