Supplier · Peer benchmark
Peer comparison
How EES Group stacks up against suppliers competing for the same workloads — based on overlap with its 1 signature CPV code over the last 24 months.
Value band:
/
CohortEES Group(You)Jacobs UK LtdNational Grid Electricity Distribution (South West) PlcEuroSite Power LimitedTNG CONSULTING ENGINEERS LIMITED
iAuto-picked from 1 signature CPV code · last 24 months overlap
Metric | JU Jacobs UK Ltd Peer · rank #1 | NG National Grid Electricity Distribution (South West) Plc Peer · rank #2 | EG EES Group (You) · target supplier | EP EuroSite Power Limited Peer · rank #4 | TC TNG CONSULTING ENGINEERS LIMITED Peer · rank #5 |
|---|---|---|---|---|---|
01ActivityVolume, scale, freshness | |||||
| 12-month contractedAward value, last 12m | £47.9m | £28k | — | — | — |
| Framework headroomPer-supplier share of framework ceilings | £264k | — | — | — | — |
| Total awarded (lifetime)All time, all contracts | £1.4bn | £260k | £6k(−99%) | £936k | £240k |
| Contracts won (12m)Distinct awards last year | 79 | 1 | — | — | — |
| Contracts (lifetime)All awards on record | 638 | ||||
How to read a target cell
The target column carries a delta — value compared to the peer median for that row. Direction-of-good varies by metric, so deltas are neutral.
Peer cell£499m(peer median £255m)
→
Target cell£11.7m(−97% vs median)
Money:
£N.Nm, £Nk, £N.NbnPercent: 42% · pp delta: (+12pp)Day delta: (−149 days) · missing: —