Supplier · Peer benchmark
Peer comparison
How ROAD SAFETY CONTRACTS LTD stacks up against suppliers competing for the same workloads — based on overlap with its 15 signature CPV codes over the last 24 months.
Value band:
/
CohortROAD SAFETY CONTRACTS LTD(You)ESH CONSTRUCTION LIMITEDWhitemountain Quarries LtdSTREETSPACE LIMITEDRECONOMY (UK) LIMITEDSmurfit Kappa Recycling
iAuto-picked from 15 signature CPV codes · last 24 months overlap
Metric | EC ESH CONSTRUCTION LIMITED Peer · rank #1 | WQ Whitemountain Quarries Ltd Peer · rank #2 | ST STREETSPACE LIMITED Peer · rank #3 | R( RECONOMY (UK) LIMITED Peer · rank #4 | RS ROAD SAFETY CONTRACTS LTD (You) · target supplier | SK Smurfit Kappa Recycling Peer · rank #6 |
|---|---|---|---|---|---|---|
01ActivityVolume, scale, freshness | ||||||
| 12-month contractedAward value, last 12m | £54.5m | £12.0m | £3.3m | £300k | — | — |
| Framework headroomPer-supplier share of framework ceilings | £1.0m | — | — | — | — | — |
| Total awarded (lifetime)All time, all contracts | £1.5bn | £27.0m | £5.0m | £12.6m | — | £25.8m |
| Contracts won (12m)Distinct awards last year | 30 | 3 | 3 | 2 | 1(−67%) | — |
How to read a target cell
The target column carries a delta — value compared to the peer median for that row. Direction-of-good varies by metric, so deltas are neutral.
Peer cell£499m(peer median £255m)
→
Target cell£11.7m(−97% vs median)
Money:
£N.Nm, £Nk, £N.NbnPercent: 42% · pp delta: (+12pp)Day delta: (−149 days) · missing: —