Supplier · Peer benchmark
Peer comparison
How John MacLennan Contractors Ltd stacks up against suppliers competing for the same workloads — based on overlap with its 1 signature CPV code over the last 24 months.
Value band:
/
CohortJohn MacLennan Contractors Ltd(You)KIELY BROS. LIMITEDCONNOR CONSTRUCTION (SOUTH WEST) LIMITEDMiles Macadam LtdRingway Infrastructure Services LimitedMarlborough Highways Limited
iAuto-picked from 1 signature CPV code · last 24 months overlap
Metric | KB KIELY BROS. LIMITED Peer · rank #1 | CC CONNOR CONSTRUCTION (SOUTH WEST) LIMITED Peer · rank #2 | MM Miles Macadam Ltd Peer · rank #3 | JM John MacLennan Contractors Ltd (You) · target supplier | RI Ringway Infrastructure Services Limited Peer · rank #5 | MH Marlborough Highways Limited Peer · rank #6 |
|---|---|---|---|---|---|---|
01ActivityVolume, scale, freshness | ||||||
| 12-month contractedAward value, last 12m | £20.0m | £11.1m | £6.4m | — | — | — |
| Framework headroomPer-supplier share of framework ceilings | — | — | — | — | £2.0bn | — |
| Total awarded (lifetime)All time, all contracts | £433.5m | £62.1m | £12.9m | — | £4.8bn | £451.1m |
| Contracts won (12m)Distinct awards last year | 28 | 3 | 7 | — | 1 | 1 |
How to read a target cell
The target column carries a delta — value compared to the peer median for that row. Direction-of-good varies by metric, so deltas are neutral.
Peer cell£499m(peer median £255m)
→
Target cell£11.7m(−97% vs median)
Money:
£N.Nm, £Nk, £N.NbnPercent: 42% · pp delta: (+12pp)Day delta: (−149 days) · missing: —