Supplier · Peer benchmark
Peer comparison
How Building Finishing Services Ltd stacks up against suppliers competing for the same workloads — based on overlap with its 20 signature CPV codes over the last 24 months.
Value band:
/
CohortBuilding Finishing Services Ltd(You)ESH CONSTRUCTION LIMITEDHenry Boot Construction LimitedMatthews and TannertLORNE STEWART PLCWG Wiggington Limited
iAuto-picked from 20 signature CPV codes · last 24 months overlap
Metric | EC ESH CONSTRUCTION LIMITED Peer · rank #1 | HB Henry Boot Construction Limited Peer · rank #2 | MA Matthews and Tannert Peer · rank #3 | BF Building Finishing Services Ltd (You) · target supplier | LS LORNE STEWART PLC Peer · rank #5 | WW WG Wiggington Limited Peer · rank #6 |
|---|---|---|---|---|---|---|
01ActivityVolume, scale, freshness | ||||||
| 12-month contractedAward value, last 12m | £90.7m | £22.7m | £6.7m | — | — | — |
| Framework headroomPer-supplier share of framework ceilings | £1.0m | — | £631k | — | £40.0m | — |
| Total awarded (lifetime)All time, all contracts | £1.5bn | £775.5m | £207.3m | — | £343.8m | £2.5m |
| Contracts won (12m)Distinct awards last year | 28 | 4 | 9 | — | 10 | — |
How to read a target cell
The target column carries a delta — value compared to the peer median for that row. Direction-of-good varies by metric, so deltas are neutral.
Peer cell£499m(peer median £255m)
→
Target cell£11.7m(−97% vs median)
Money:
£N.Nm, £Nk, £N.NbnPercent: 42% · pp delta: (+12pp)Day delta: (−149 days) · missing: —