Supplier · Peer benchmark
Peer comparison
How Lewis & Martin (Construction) Lt stacks up against suppliers competing for the same workloads — based on overlap with its 1 signature CPV code over the last 24 months.
Value band:
/
CohortLewis & Martin (Construction) Lt(You)Balfour Beatty Civil Engineering Limited (BBCE)Octavius Infrastructure LimitedNeom Engineering LtdRingway Infrastructure Services LimitedR&C Williams Limited
iAuto-picked from 1 signature CPV code · last 24 months overlap
Metric | BB Balfour Beatty Civil Engineering Limited (BBCE) Peer · rank #1 | OI Octavius Infrastructure Limited Peer · rank #2 | NE Neom Engineering Ltd Peer · rank #3 | L& Lewis & Martin (Construction) Lt (You) · target supplier | RI Ringway Infrastructure Services Limited Peer · rank #5 | RW R&C Williams Limited Peer · rank #6 |
|---|---|---|---|---|---|---|
01ActivityVolume, scale, freshness | ||||||
| 12-month contractedAward value, last 12m | £60.0m | £19.8m | £6.3m | — | — | — |
| Framework headroomPer-supplier share of framework ceilings | — | — | £313k | £313k(0%) | £2.0bn | £313k |
| Total awarded (lifetime)All time, all contracts | £60.0m | £133.3m | £41.0m | £2.5m(−96%) | £4.8bn | £18.1m |
| Contracts won (12m)Distinct awards last year | 1 | 6 | 2 | 1(0%) | 1 | |
How to read a target cell
The target column carries a delta — value compared to the peer median for that row. Direction-of-good varies by metric, so deltas are neutral.
Peer cell£499m(peer median £255m)
→
Target cell£11.7m(−97% vs median)
Money:
£N.Nm, £Nk, £N.NbnPercent: 42% · pp delta: (+12pp)Day delta: (−149 days) · missing: —