Supplier · Peer benchmark
Peer comparison
How D.T. Ground Maintenance stacks up against suppliers competing for the same workloads — based on overlap with its 1 signature CPV code over the last 24 months.
Value band:
/
CohortD.T. Ground Maintenance(You)Glendale Countryside LtdCONNOR CONSTRUCTION (SOUTH WEST) LIMITEDRingway Infrastructure Services LimitedMilestone Infrastructure LimitedT&G Services Leicestershire Ltd
iAuto-picked from 1 signature CPV code · last 24 months overlap
Metric | GC Glendale Countryside Ltd Peer · rank #1 | CC CONNOR CONSTRUCTION (SOUTH WEST) LIMITED Peer · rank #2 | DG D.T. Ground Maintenance (You) · target supplier | RI Ringway Infrastructure Services Limited Peer · rank #4 | MI Milestone Infrastructure Limited Peer · rank #5 | TS T&G Services Leicestershire Ltd Peer · rank #6 |
|---|---|---|---|---|---|---|
01ActivityVolume, scale, freshness | ||||||
| 12-month contractedAward value, last 12m | £641k | £403k | — | — | — | — |
| Framework headroomPer-supplier share of framework ceilings | £174k | — | — | £2.0bn | — | — |
| Total awarded (lifetime)All time, all contracts | £180.4m | £62.1m | — | £4.8bn | £1.7bn | £2.3m |
| Contracts won (12m)Distinct awards last year | 19 | 2 | — | 1 | — | — |
How to read a target cell
The target column carries a delta — value compared to the peer median for that row. Direction-of-good varies by metric, so deltas are neutral.
Peer cell£499m(peer median £255m)
→
Target cell£11.7m(−97% vs median)
Money:
£N.Nm, £Nk, £N.NbnPercent: 42% · pp delta: (+12pp)Day delta: (−149 days) · missing: —