Supplier · Peer benchmark
Peer comparison
How Contract Not Awarded stacks up against suppliers competing for the same workloads — based on overlap with its 20 signature CPV codes over the last 24 months.
Value band:
/
CohortContract Not Awarded(You)Kier ConstructionPHS Home Solutions LimitedG F Tomlinson Building LimitedSURESERVE ENERGY SERVICES UK LIMITEDMIS Active Management Systems Limited
iAuto-picked from 20 signature CPV codes · last 24 months overlap
Metric | KC Kier Construction Peer · rank #1 | PH PHS Home Solutions Limited Peer · rank #2 | GF G F Tomlinson Building Limited Peer · rank #3 | SE SURESERVE ENERGY SERVICES UK LIMITED Peer · rank #4 | MA MIS Active Management Systems Limited Peer · rank #5 | CN Contract Not Awarded (You) · target supplier |
|---|---|---|---|---|---|---|
01ActivityVolume, scale, freshness | ||||||
| 12-month contractedAward value, last 12m | £4.3bn | £39.7m | £14.1m | £10.1m | £2.9m | — |
| Framework headroomPer-supplier share of framework ceilings | — | — | — | — | — | — |
| Total awarded (lifetime)All time, all contracts | £12.6bn | £206.9m | £155.2m | £60.2m | £20.8m | £35.2m(−77%) |
| Contracts won (12m)Distinct awards last year | 37 | 8 | 2 | 5 | 1 | — |
How to read a target cell
The target column carries a delta — value compared to the peer median for that row. Direction-of-good varies by metric, so deltas are neutral.
Peer cell£499m(peer median £255m)
→
Target cell£11.7m(−97% vs median)
Money:
£N.Nm, £Nk, £N.NbnPercent: 42% · pp delta: (+12pp)Day delta: (−149 days) · missing: —