Supplier · Peer benchmark
Peer comparison
How Tarmac (Ready Mix) stacks up against suppliers competing for the same workloads — based on overlap with its 1 signature CPV code over the last 24 months.
Value band:
/
CohortTarmac (Ready Mix)(You)Kier ConstructionCLC Contractors LtdTRAVIS PERKINS TRADING COMPANY LIMITEDClear Channel UK LtdRingway Infrastructure Services Limited
iAuto-picked from 1 signature CPV code · last 24 months overlap
Metric | KC Kier Construction Peer · rank #1 | CC CLC Contractors Ltd Peer · rank #2 | TP TRAVIS PERKINS TRADING COMPANY LIMITED Peer · rank #3 | CC Clear Channel UK Ltd Peer · rank #4 | T( Tarmac (Ready Mix) (You) · target supplier | RI Ringway Infrastructure Services Limited Peer · rank #6 |
|---|---|---|---|---|---|---|
01ActivityVolume, scale, freshness | ||||||
| 12-month contractedAward value, last 12m | £4.3bn | £41.4m | £19.9m | £6k | — | — |
| Framework headroomPer-supplier share of framework ceilings | — | — | — | — | — | £2.0bn |
| Total awarded (lifetime)All time, all contracts | £12.4bn | £2.7bn | £919.6m | £216.3m | £200k(−100%) | £4.8bn |
| Contracts won (12m)Distinct awards last year | 37 | 16 | 6 | 2 | — | 1 |
How to read a target cell
The target column carries a delta — value compared to the peer median for that row. Direction-of-good varies by metric, so deltas are neutral.
Peer cell£499m(peer median £255m)
→
Target cell£11.7m(−97% vs median)
Money:
£N.Nm, £Nk, £N.NbnPercent: 42% · pp delta: (+12pp)Day delta: (−149 days) · missing: —