Supplier · Peer benchmark
Peer comparison
How Jack Coupe Line T/A Coupe Line Limited stacks up against suppliers competing for the same workloads — based on overlap with its 1 signature CPV code over the last 24 months.
Value band:
/
CohortJack Coupe Line T/A Coupe Line Limited(You)WJ NORTH LIMITEDWilson and Scott (Highways) LtdWJ South LimitedSAS Lining Services LtdCamway Facilities Maintenance Limited
iAuto-picked from 1 signature CPV code · last 24 months overlap
Metric | WN WJ NORTH LIMITED Peer · rank #1 | WA Wilson and Scott (Highways) Ltd Peer · rank #2 | JC Jack Coupe Line T/A Coupe Line Limited (You) · target supplier | WS WJ South Limited Peer · rank #4 | SL SAS Lining Services Ltd Peer · rank #5 | CF Camway Facilities Maintenance Limited Peer · rank #6 |
|---|---|---|---|---|---|---|
01ActivityVolume, scale, freshness | ||||||
| 12-month contractedAward value, last 12m | £10.6m | £2.9m | £240k(−96%) | — | — | — |
| Framework headroomPer-supplier share of framework ceilings | — | — | — | — | — | — |
| Total awarded (lifetime)All time, all contracts | £195.1m | £147.7m | £240k(−99%) | £21.7m | £7.7m | £105k |
| Contracts won (12m)Distinct awards last year | 10 | 2 | 1(−83%) | — | ||
How to read a target cell
The target column carries a delta — value compared to the peer median for that row. Direction-of-good varies by metric, so deltas are neutral.
Peer cell£499m(peer median £255m)
→
Target cell£11.7m(−97% vs median)
Money:
£N.Nm, £Nk, £N.NbnPercent: 42% · pp delta: (+12pp)Day delta: (−149 days) · missing: —