Supplier · Peer benchmark
Peer comparison
How City Loo Hire stacks up against suppliers competing for the same workloads — based on overlap with its 10 signature CPV codes over the last 24 months.
Value band:
/
CohortCity Loo Hire(You)ESH CONSTRUCTION LIMITEDTVS Supply Chain Solutions LimitedScott AerospaceCore Control SolutionBasetek Limited
iAuto-picked from 10 signature CPV codes · last 24 months overlap
Metric | EC ESH CONSTRUCTION LIMITED Peer · rank #1 | TS TVS Supply Chain Solutions Limited Peer · rank #2 | CL City Loo Hire (You) · target supplier | SA Scott Aerospace Peer · rank #4 | CC Core Control Solution Peer · rank #5 | BA Basetek Limited Peer · rank #6 |
|---|---|---|---|---|---|---|
01ActivityVolume, scale, freshness | ||||||
| 12-month contractedAward value, last 12m | £90.7m | £166k | — | — | — | — |
| Framework headroomPer-supplier share of framework ceilings | £1.0m | — | — | — | £18.8m | — |
| Total awarded (lifetime)All time, all contracts | £1.5bn | £166.4m | — | £90.1m | £46.4m | £11.7m |
| Contracts won (12m)Distinct awards last year | 28 | 2 | — | 5 | 1 | — |
How to read a target cell
The target column carries a delta — value compared to the peer median for that row. Direction-of-good varies by metric, so deltas are neutral.
Peer cell£499m(peer median £255m)
→
Target cell£11.7m(−97% vs median)
Money:
£N.Nm, £Nk, £N.NbnPercent: 42% · pp delta: (+12pp)Day delta: (−149 days) · missing: —