Supplier · Peer benchmark
Peer comparison
How PYRAMID SOLUTION SOUTH EAST LIMITED T/A A Pyramid Eco stacks up against suppliers competing for the same workloads — based on overlap with its 2 signature CPV codes over the last 24 months.
Value band:
/
CohortPYRAMID SOLUTION SOUTH EAST LIMITED T/A A Pyramid Eco(You)EQUANS Regeneration LimitedC.L.C. CONTRACTORS LIMITEDRothwell Plumbing Services Group LtdGW Power Safe LtdCity Electrical Factors Ltd
iAuto-picked from 2 signature CPV codes · last 24 months overlap
Metric | ER EQUANS Regeneration Limited Peer · rank #1 | CC C.L.C. CONTRACTORS LIMITED Peer · rank #2 | RP Rothwell Plumbing Services Group Ltd Peer · rank #3 | GP GW Power Safe Ltd Peer · rank #4 | CE City Electrical Factors Ltd Peer · rank #5 | PS PYRAMID SOLUTION SOUTH EAST LIMITED T/A A Pyramid Eco (You) · target supplier |
|---|---|---|---|---|---|---|
01ActivityVolume, scale, freshness | ||||||
| 12-month contractedAward value, last 12m | £160.7m | £77.2m | £10.1m | £1.3m | £498k | £156k(−98%) |
| Framework headroomPer-supplier share of framework ceilings | — | — | — | — | — | — |
| Total awarded (lifetime)All time, all contracts | £2.3bn | £3.0bn | £245.7m | £21.3m | £214.6m | £156k(−100%) |
| Contracts won (12m)Distinct awards last year | 19 | 38 | 8 | 2 | 12 | |
How to read a target cell
The target column carries a delta — value compared to the peer median for that row. Direction-of-good varies by metric, so deltas are neutral.
Peer cell£499m(peer median £255m)
→
Target cell£11.7m(−97% vs median)
Money:
£N.Nm, £Nk, £N.NbnPercent: 42% · pp delta: (+12pp)Day delta: (−149 days) · missing: —