3808/JN - Flue Gas/CO2 Scrubbing and Conditioning System (16 Lots)
Estimated value
—
Awarded value
—
Suppliers
10
Lots
16
Published
22 Sept 2023
Description
With co-funding from the European Regional Development Fund and BEIS, the University of Sheffield is establishing a national Translational Energy Research Centre (TERC) as an integrated multi-technology, pilotscale R&D platform for low-carbon technologies including hydrogen, bioenergy (BE), and Carbon Capture, Utilisation and Storage (CCUS). Site equipment includes a Molten Carbonate Fuel Cell (MCFC) which forms part of a Bioenergy with Carbon Capture and Storage/Utilisation (BECCS) system. This tender covers the scrubbing and conditioning of biomass boiler flue gas (as well as synthetic/semi-synthetic flue gas) to meet stringent purity requirements of the MCFC. It also covers fuel feed to the Anode side of the MCFC. S-containing impurities as well as compounds containing halogens (e.g., HCl), As, Se and P must be scrubbed to low ppb levels to prevent poisoning of the plant catalyst.
Scope
- Reference
- 3808/JN
- Commercial tool
- Standalone contract
- Contract dates
- 29 Aug 2023 to 31 Aug 2023
- Main category
- goods
- CPV classifications
- 3116120038000000
- Contract locations
- Yorkshire and the Humber
Award criteria
Criteria the buyer will use to evaluate bids.
| Name | Description | Type | Weighting |
|---|---|---|---|
| Quality | 42 | quality | — |
| — | 30 | price | — |
| Quality | 53 | quality | — |
| Quality | 207 | quality | — |
| Quality | 75 | quality | — |
| Quality | 196 | quality | — |
| Quality | 163 | quality | — |
| Quality | 97 | quality | — |
| Quality | 130 | quality | — |
| Quality | 86 | quality | — |
| Quality | 119 | quality | — |
| Quality | 31 | quality | — |
Submission & procedure
- Procedure
- Open procedure
Award details· 16 awards
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
—
Award date
—
Contract start
—
Contract end
—
Lots · 16 total
Divisions of the contract. Each lot can be awarded separately.
| Lot | Title | Est. value | Status |
|---|---|---|---|
| 1 | Flue gas probe, cathode inlet mixing valve, O2 feed in skid (a-c) | £8k | cancelled |
| 2 | Flue gas filter | £10k | cancelled |
| 3 | Flue gas fan (a-c) | £8k | cancelled |
| 4 | Wet scrubber and demister | £60k | cancelled |
| 5 | CO2 dryer | £17k | cancelled |