Demolition Services M3J9

BALFOUR BEATTY CIVIL ENGINEERING LIMITEDcontractContracts FinderRef DemolitionM3J9SME suitableclosed
View buyer

Estimated value

£325k

Awarded value

Suppliers

0

Lots

1

0 awarded

Published

09 Sept 2025

Deadline 19 Sept 2025

Description

The M3 and Junction 9 (located in Winchester) connects South Hampshire with London, the Midlands and the North. Traffic levels are heavy at junction 9 between the M3 and A34, resulting in lengthy queues on the northbound off-slip of the M3 and A272 Spitfire Link, affecting journey times and road safety. The proposal is to make changes to Junction 9 so it has free flowing links between the M3 and A34 in both directions. The construction would include for the junction to be widened and build two new gyratory bridges allowing the M3 to increase from 3 lanes to 4 lanes. Also, the works would improve NMU facilities in and around the junction for both pedestrians and cyclists. Other construction works include but not limited to the following: -2no. underpasses for the M3 mainline and A34 Northbound -1no. pedestrian subway -9no. MS4s, 1no. long span and 1no. portal gantries -Footbridge over the River Itchen -6no. locations for sheet piling locations and 1no. for blockwork retaining wall -Site wide motorway communications installation -Site wide vehicle restraint barrier installation The scope is for general demolition works on the M3J9.

Scope

Reference
DemolitionM3J9
Total value
£325,000 excluding VAT
Commercial tool
Standalone contract
Contract dates
31 Jul 2026 to 30 Sept 2026
CPV classifications
45000000
Particular suitability
Small and medium-sized enterprises (SME)

Submission & procedure

Submission deadline
19 Sept 2025, 4:00 pm