24/033 - South West Scotland Onshore System (SWSOS) Electrification Program

GasNetworks IrelandcontractFind a TenderRef ocds-h6vhtk-04a44132014L0025planned
View buyer

Estimated value

works

Awarded value

Suppliers

0

Lots

1

0 awarded

Published

30 Sept 2024

Deadline 28 Oct 2024

This is a preliminary market engagement notice

Map the supplier landscape and document your shortlist before opening the tender. The market simulation produces a defensible audit record you can attach to your procurement file.

Run market simulation

Description

Gas Networks Ireland (GNI) operates two compressor stations Brighouse Bay and Beattock, both in located in South Scotland, to transport natural gas from the UK through a pipeline system to Ireland. The natural gas compressors on these compressor station are driven by gas turbines between 6MW and 12MW of rated power. The primary objective of the Electrification Programme is to reduce the use of fuel gas in the operation of the Brighouse Bay and Beattock compressors stations and associated fugitive emissions thereby aiding the reduction of greenhouse gas emission intensity by 50% (from 2010 level) by 2030 as outlined in Gas Networks Ireland's Low Carbon Pledge. The Electrification Programme at both Brighouse Bay and Beattock compressor stations comprises three major components at both stations: 1. construction of a new compressor hall with an EMD and ancillary equipment; 2. construction of a new electrical connection to upgrade the supply capacity to power the new EMD; and 3. the installation of a vent recovery system to capture normally vented gas and return it to the gas network.

Scope

Reference
24/033
Commercial tool
Standalone contract
Main category
works
CPV classifications
45111290
45200000
45310000
45351000
Contract locations
Scotland

Submission & procedure

Submission deadline
28 Oct 2024, 12:00 pm