Lynemouth - Design, Manufacture and Installation of Lagoon Baffles

The Coal AuthoritycontractContracts FinderRef CA18/2/1/37/ AwardSME suitablecomplete
View buyer

Estimated value

Awarded value

£47k

Awarded 21 Nov 2019

Suppliers

1

Lots

1

1 awarded

Published

27 Dec 2019

Deadline 19 Sept 2019

Description

The Employer requires a pair of bespoke baffles to be designed, manufactured and installed in a lagoon located at Lynemouth Mine Water Treatment Scheme. The Lynemouth Phase I mine water treatment scheme (MWTS) is located on the Northumberland coast on the site of the former Ellington Colliery. Coal mine water is abstracted at a rate of circa. 115 L/s from an abandoned mine shaft, treated through two lagoons configured in series before being discharged into the sea. The lagoons are constructed in colliery spoil and lined with an HDPE liner. The treatment process is designed to reduce total iron in the effluent which presents as ochre sludge in the lagoons; the mine water is currently subject to peroxide dosing. Lagoons are taken off line periodically (24 month intervals) to remove sludge by means of pumping. The site is in a remote location there being no permanent welfare facilities on the site. The employer intends to install two baffles in lagoon No 1 in order to optimise: • mean residence time; • longitudinal mixing characteristics; • reaction and settlement of ochre within the lagoon.

Scope

Reference
CA18/2/1/37/ Award
Commercial tool
Standalone contract
Contract dates
29 Sept 2019 to 31 Jan 2020
CPV classifications
43328000
Particular suitability
Small and medium-sized enterprises (SME)

Submission & procedure

Submission deadline
19 Sept 2019, 11:00 pm

Award details

Awarded supplier(s), contract period and value as published in the award notice.

Awarded value

£47k

Award date

21 Nov 2019

Contract start

29 Sept 2019

Contract end

31 Jan 2020