Hydrogen Gas Generator System (MOVPE Reactors)
Estimated value
£680k
Awarded value
£680k
Suppliers
1
Lots
1
Published
28 Mar 2024
Description
The requirement is for a high purity hydrogen generator capable of producing a stable and uninterrupted flow of high purity hydrogen gas to multiple MOVPE reactors in a semiconductor manufacturing facility. The existing hydrogen generation system is sited within the facility building in a ventilated steel enclosure with a footprint of 3.6m x 4.8m, max height 2.8 m. The new system can either be installed within this existing envelope or in an external location in a suitable weatherproof enclosure to be supplied as part of the tender.
Scope
- Reference
- 3821/DM/23
- Total value
- £680,000 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 01 Oct 2023 to 29 Sept 2024
- CPV classifications
- 42000000
- Particular suitability
- Small and medium-sized enterprises (SME)Voluntary, community and social enterprises (VCSE)
Submission & procedure
- Submission deadline
- 15 Aug 2023, 11:00 am
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
£680k
Award date
04 Mar 2024
Contract start
01 Oct 2023
Contract end
29 Sept 2024